Complete design, precision fabrication, and high-altitude erection of a 5,000-ton structural steel framework for a new, state-of-the-art automotive manufacturing facility.
The client required an aggressive 18-month timeline to bring the factory online to meet new vehicle production targets.
By operating our fabrication workshops on a 24/7 dual-shift system and utilizing advanced 3D BIM modeling to prevent clashes before components arrived on site, we delivered the framework three weeks ahead of schedule.